B&K Chino Concrete CompanyB&K Chino Concrete Company(909) 479-6302

Foundation installation in Chino CA - a slab that fits your house and your ground

Building a new home or addition and need the concrete it sits on? We help you pick the slab and pour it on solid prep.

Concrete pool deck with large gray pavers surrounds a swimming pool beneath a covered patio with outdoor seating.

What does it take to build a new foundation in Chino?

Foundation installation in Chino, CA builds the concrete base your house rests on, and our crew forms, pours and finishes it so the walls go up on something flat and solid.

If you're putting up a new house, an addition or a building on your lot, the foundation disappears once the framing starts, so it's the part I care most about getting right. The price moves with the size of the slab, the slab type, how much digging and base work the ground needs and whether an engineer has to be involved. The schedule turns on the permit, the city's inspections and the weather on pour day, and your own figure comes from the written estimate after I've seen the site.

We're licensed and insured, and the state licensing board describes a concrete contractor's work as forming, pouring, placing and finishing concrete, which is what a foundation comes down to.

  • We dig out and pack the subgrade, the ground the slab sits on, before forms go up.
  • Rebar, the steel bars that hold a slab together, or tensioned cables go in before the pour.
  • We check how water runs across the lot so the finished grade sends it away from the house.

What happens after you call about a new foundation?

I look at every foundation job myself, and my crew and I do the work. Here's how it goes from your first call to the day we clean up after the pour.

  1. Call or send the form

    Call us or use the form on this page, and tell us the address and what you plan to build. We'll set a time for me to come out to the site.

  2. I walk the site with you

    I look at the lot and your plans, and we talk through the slab type and the prep the ground needs. Then you get a written estimate to look over on your own time, before you commit to anything.

  3. We settle the plan and permit

    Before we pour, we go over the plan, the prep and anything the city needs, and we set the schedule around its inspections. If the lot is in a liquefaction zone on the state's seismic hazard map, ground that may lose its strength in a strong earthquake, the permit process may require that hazard to be looked into and dealt with first.

  4. We pour, finish and clean up

    On pour day the crew and I stay on the job until the slab is finished and the site is cleaned up. Then the concrete needs time to cure, the slow hardening that gives it its strength, before framing goes on it.

How we handle foundation installation from start to finish

Before anything gets formed, we settle with you which slab type fits the house and who'll hold the permit, because getting both decided up front means nobody's guessing later. Then we dig out and pack the base, set the forms and steel, and pour early in the day when we can, since a slab poured in midday heat can end up with a weak, dusty top. When a job calls for an engineer or a scanning company, we bring in a licensed one. The base is the part you can't see on day one and the first thing people want to trim from the budget, and I won't cut it, because most bad concrete I've torn out failed from what was under it, not the mix.

Some houses also need concrete footings, the deeper pours under walls and posts that carry the heaviest loads, and we can do those as part of the same job. For builders and property owners putting up something bigger, we also do concrete parking lot building, so the same crew pours the lot around the new building.

  • Post-tensioned slab

    This slab has steel cables pulled tight after the pour to squeeze the concrete, and the Post-Tensioning Institute says it can often go in faster than a comparable rebar or wire-mesh slab, because there are fewer pieces to handle and less concrete to place. It suits owners on a tight schedule and ground that moves, which the FAQ below covers.

  • Rebar-reinforced slab

    This is the familiar slab, with steel bars or wire mesh tied in place before the pour, and plenty of house plans are drawn around it. It suits builds where the plans and the engineer, if there is one, call for steel set in the slab rather than cables.

Get a written estimate for your new foundation

Send the form or call (909) 479-6302 with your address and building plans, and we'll reply within one business day. I'll come out to look at the site, and the estimate is free with no obligation.

(909) 479-6302

Questions about new foundations in Chino, answered

These are the questions I hear most from people planning a new house or addition in Chino. Most come down to the slab type, the permit and what happens to the concrete over time.

Is a post-tensioned slab right for my soil?

It's worth asking about if your ground shrinks and swells, because the Post-Tensioning Institute calls these slabs a cost-efficient answer to foundation problems on that kind of soil. The squeezing force built into the slab resists the pull of moving ground, and the institute says they're used on stable soils too, to reduce cracking and make the slab easier to build. When the ground needs a closer look, we bring in an engineer.

Who holds the building permit for a new foundation in Chino?

Either the licensed contractor or the property owner holds it, because Chino's building permit application issues the permit in one of those two names. Whoever holds it is responsible and liable for the construction, so the choice decides who carries that. We're licensed and insured, and we work out with you who pulls the permit before anything starts.

How do I book a foundation inspection in Chino?

Call the Chino Building Division before 3 pm to get an inspection the next day. Its inspectors cover both homes and commercial buildings, and we plan the pour around that cutoff so the crew isn't standing around waiting on a sign-off.

Can I sell a house I built as an owner-builder in Chino?

Not unless licensed contractors built all of it, according to the owner-builder statement on the city's permit application. The exception is a home you lived in as your personal residence for at least a year before the work was completed, so it's worth weighing before you decide who holds the permit.

How much does a new foundation cost in Chino?

There's no honest number until I've seen the lot, because the footprint, the slab type and the site work change the price more than anything else. A bigger footprint, a lot that needs more digging and fill, extra engineering or tight access for the trucks push it up, and a simple shape on open, level ground keeps it down. After I walk the site, you get a written estimate with your own figure.

What causes a new foundation slab to crack?

Concrete cracks as it shrinks and as the ground under it moves, and the slab type changes how those cracks behave. The Post-Tensioning Institute says post-tensioning reduces cracking and keeps the cracks that do form tight, which helps keep insects out and cuts down on water seeping in that can damage flooring and cause mold.

Foundation installation in Chino and nearby cities

In Chino the city's Building Division issues building permits, and if it isn't clear what your job needs, we check with that office before we start. We do the same work in Chino Hills, Ontario and the cities around them.

(909) 479-6302Get an estimate